成长值: 57295
|
CCIE RS Lab N5版本题目_亚威2009年2月考试版
1.1 Switch Management
ether on each switch (sw1,sw2,sw3,and sw4) an IOS command that allows all Fast Ethernet Port to be configured at once you will find this step usesful(看不清楚,貌似是这个单词) on the next question.
note: the GB ethernet ports on these devices are not used in this test
1.2 Switch Protocols
disable DTP and VTP traffic on all Fast Ethernet ports on all switches
1.3 VLAN Managment
VLAN ID VLAN Name Switch Port
11 VLAN_A R1 g0/0
12 VLAN_B R5 g0/1
R2 fa0/0
13 VLAN_C R3 g0/0
R6 g0/1
14 VLAN_D R4 g0/0
15 VLAN_BB1 R6 g0/0
BB1
16 VLAN_BB2 R5 g0/0
BB2
1.4 Trunking
trunk as a simple way to load balance traffic create 2 separate isl trunks between sw1 and sw2 using these ports.
trunk all odd VLANs that are being used in you topology over port Fa0/23
trunk all even VLANs that are being used in you topology over port Fa0/24
Make sure all VLANs are present on both switches
1.5 Etherchannel
Sw1 and sw3 Fa0/19 and Fa0/20 etherchannel
These interface to build 2 two-port standards-based EthernetChannel link with follow 参数
The link should NOT be a trunk and should only service VLAN 13
The port on sw3 must initiate negotiation to form the channel
The port on sw1 should not initiate negotiation to form the channel
use your rack number in rhe form “YY” to number your port-channel
1.6 SVI
Add the following switch virtual interface to SW1-VLAN_D and Sw3-VLAN_C Once they are configured make sure that you have connectivity to any other device on that network segment
Add IP address YY.YY.13.7/24 to Sw1
Add IP address YY.YY.17.9/24 to Sw3
CCIE RS Lab N5版本题目_亚威2009年2月考试版.rar.pdf
(615 KB, 下载次数: 98)
|
|